欧美日韩国产精品-www 在线观看视频-国产女人18毛片18精品-操极品美女-美女91网站-超碰资源-日本高清不卡一区-黄色高潮视频-国产丝袜视频在线观看-四虎av影院-日韩久久中文字幕-国产精选第一页-wwwxxx日本免费-想要xx视频-男女网站视频-亚洲美女精品-日免费视频-成人四色-youjizz日本人-在线精品播放-午夜神器在线观看-四虎国产在线观看-亚洲精品视频一二三区-妺妺窝人体色777777-久久久精品美女

Project Introduction

[]

馬拉維水泥廠球形網(wǎng)架,水泥廠球形網(wǎng)架
Steel grid spherical shell description: Jiangsu Huahai Steel Structure Co., Ltd. undertakes the construction of the steel grid spherical shell structure of the clinker warehouse of the cement plant, a professional spherical grid design and processing manu

Cement industry grid

Steel grid spherical shell description: Jiangsu Huahai Steel Structure Co., Ltd. undertakes the construction of the steel grid spherical shell structure of the clinker warehouse of the cement plant, a professional spherical grid design and processing manufacturer


1. Project Overview

1. Structural form: The roof structure of the clinker warehouse is a quadrangular cone bolted spherical joint grid frame

2. Node form: bolt ball

3, the projection area is approximately: 2900m2

4. The total installation height has reached 43m, and the maximum span is 60.5m.

5. Support form: multi-point support at the peripheral lower chord

6. Base material thickness of aluminum-zinc-plated roofing color steel plate: 0.6mm, double-sided aluminum-zinc-plated color steel plate, the total weight of the coating is not less than 210g/m, and the color is purple-red.

2. Processing technology

(1) Rod → Rod blanking number → inspection → group welding → inspection → welding → inspection → pre-painting treatment → inspection → painting → number → storage → shipment;

(2) Support → lower support plate material → inspection → hole making → inspection → assembly welding of support body and transition plate → inspection → welding → inspection → support ball assembly → inspection → pre-painting treatment → inspection → Painting→number→inspection→warehouse→shipment;

(3) Support → support tube, board blanking → inspection → assembly welding → inspection → welding → inspection → pre-painting treatment → inspection → painting → numbering → inspection → storage → shipment.

三. Grid derusting and coating process

The location of this project is a mountainous area, where there is a lot of rain all year round, so the humidity is high. In addition, the plant is a cement plant with heavier corrosive gases in the air and high anti-corrosion requirements for steel components. According to the design requirements, this project uses sandblasting to remove rust, and the rust removal level reaches Sa2.5. The primer uses two coats of epoxy zinc-rich primer and the top coat uses two coats of polyurethane paint.